Information about the Trail @ Sepang Jamboree 2012
Start Point - CP1
The starting point will be at the event venue (enclosed) for flag-off. Here, you guys will undergo a tarmac road of approximately 6km around the outside track of the Sepang F1 circuit before ajourning into the off-road. Expect some tough hill climbs of double lane until you reach the first check point and then the water station.
Difficulty Level - 3.5/5
Endurance Level - 2.5/5
Total Distance - 18km
Chicken Loop - Yes
Lorry Transport - Yes
Water Refil - Yes
Bananas - Yes
Ambulance Standby - Yes
CP1 - CP2
Here, you guys will meet some sunny trails, and generally a long loop. This section covers most of the Sepang Jamboree 2012 trail and some areas are uncovered. Not much high hills to climb but the terrain will bring your inner guts out if you're chasing time/placing.
Difficulty Level - 2.5/5
Endurance Level - 3.5/5
Total Distance - 13km
Chicken Loop - Yes
Lorry Transport - Yes
Water Refil - Yes
Bananas - Yes
Ambulance Standby - Yes
CP2 - CP3
This section is basically hill climbs but short ones. Climb to the top to have a sceneric view of the LCCT airport. Hard packed terrain, loose gravels mix. The last climb to the very top to reach the final Check Point then its a short distance of tarmac to finish the ride.
Difficulty Level - 3/5
Endurance Level - 3/5
Total Distance - 9km
Chicken Loop - N/A (None)
Lorry Transport - None
Water Refil - No (less than 1km to event venue-refil there)
Bananas - N/A (None)
Ambulance Standby - No (only stanby marshals)
Note : We shall release the trail 'xxx.gpx' for you guys 5 days before the event, but we will not disclose the Check Point whereabouts. Download it onto your Garmin units to enjoy the trail. If you do not have one yet, get it at our sponsor's bicycle shop located at :
Cycle Craft
108G, Jalan Puteri 5/1
Bandar Puteri
47100 Puchong
603-8060 7611
11am-7pm (Mon-Sat)
2pm-7pm (Sun) -closed on 11-11-12
Special discount rates for Sepang Jamboree 2012 participants only. Only valid from now till 11 Nov 2012.